The government will allocate almost 4 billion rubles to provide pensions to residents of the new regions.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

A total of 3.9 billion rubles will be allocated to provide pensions to citizens living in the Donetsk and Luhansk People's Republics, as well as the Zaporizhia and Kherson regions. A corresponding order has been signed.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

The government is launching a preferential lending program for projects to create fast charging hubs for electric vehicles.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Document

Resolution of December 30, 2025 No. 2229

Russia is launching a program of subsidized loans for projects to build charging hubs for electric vehicles using direct current (DC). Prime Minister Mikhail Mishustin signed a decree approving the rules for providing subsidies for this purpose.

Comment

From Mikhail Mishustin's opening remarks at the Government meeting, January 22, 2026

Thanks to the subsidy, the investor will receive a preferential loan rate of 8% per annum. The loan will be issued for a term of up to five years. The funds can be used, among other things, to purchase or lease the appropriate land, acquire the necessary equipment, as well as for the delivery, installation, and connection of the charging hub to the power grid.

The charging hub will include at least 10 charging stations with power balancing, allowing electric vehicles to be serviced simultaneously. Charging stations using direct current (fast chargers) can charge an electric vehicle's battery to 80% capacity in 20-30 minutes. The hub can be located within residential areas or on highways. In this case, the charging hub must be located on the same plot of land (or adjacent to it) as a permanent food service outlet and restroom.

Commenting on the decision takenGovernment meeting on January 22Mikhail Mishustin noted that 150 million rubles will be allocated from the federal budget in 2026 to subsidize preferential loans.

"Only those investors who use equipment and software exclusively of Russian origin will be eligible for preferential financing," the Prime Minister clarified.

The head of the cabinet emphasized that this new support instrument will create significant added value in the economy and facilitate technological development.

The work is being carried out within the framework of the federal project "Production of Innovative Transport", which is part of the national project "Industrial Support of Transport Mobility".

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

The government will allocate 26.5 billion rubles to continue the program of preferential loans for agricultural producers and processors of agricultural products.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Document

Order No. 50-r of January 21, 2026

Systematic support for agricultural enterprises remains a priority for the Government. In 2026, an additional 26.5 billion rubles will be allocated from the federal budget for the implementation of the preferential lending program for farmers. Prime Minister Mikhail Mishustin signed the corresponding order.

Comment

From Mikhail Mishustin's opening remarks at the Government meeting, January 22, 2026

Among the purposes for which federal funding is allocated is subsidizing loans to farmers for seasonal fieldwork, including the purchase of fuel, seeds, and mineral fertilizers for the sowing campaign. Federal funds will also be used to support preferential loan rates for dairy farmers.

“We hope that such state support will improve the sustainability of farms and enable them to meet food security objectives in terms of milk and dairy products, as well as continue to harvest good crops,” Mikhail Mishustin noted, commenting on the decision taken atGovernment meeting on January 22.

Taking into account the allocated funds, the total volume of subsidized preferential loans for farmers from the federal budget will amount to 150.1 billion rubles.

The work is being carried out within the framework of the state program for the development of agriculture.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Yuri Trutnev: The fight against the consequences of heavy snowfalls in Kamchatka continues.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Access to some social infrastructure facilities in the region is currently restricted, including 17 kindergartens and 14 schools.

To expedite the cyclone cleanup effort, at the request of Yuri Trutnev, Deputy Prime Minister and Presidential Plenipotentiary Envoy to the Far Eastern Federal District, Primorye, Sakhalin, and Moscow have provided snow removal equipment. The Ministry of Civil Defense, Emergencies, and Disaster Relief (EMERCOM of Russia) has provided an Il-76 aircraft to transport the specialized equipment, which has already delivered the first equipment to Kamchatka.

However, some of the heavy equipment, due to its size, cannot be transported on the Il-76. Therefore, Yuri Trutnev approached the Ministry of Defense with a request to allocate an An-124 Ruslan aircraft. Defense Minister Andrei Belousov assured Yuri Trutnev that the necessary aircraft would be provided.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Marat Khusnullin: More than 310 km of federal roads were expanded in 2025 under the "Infrastructure for Life" national project.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Expanding federal highways with traffic separation is one of the key development vectors for the road network, enshrined in the Transport Strategy to 2030. In 2025, the Federal Road Agency (Rosavtodor), as part of the "Infrastructure for Life" national project, upgraded more than 310 km of its roads to four and six lanes. This was announced by Deputy Prime Minister Marat Khusnullin.

"Expanding the roadways of federal highways remains a priority in road management. This is essential for the socioeconomic development of regions and the country as a whole: growing traffic flows require increased road capacity, which ensures uninterrupted communication between cities, improves road safety, expedites freight transport, and improves logistics. Under the national project 'Infrastructure for Life,' Rosavtodor has expanded more than 310 km of federal highways to four and six lanes by 2025, including more than 120 km through reconstruction and 190 km through major repairs," said Marat Khusnullin.

The conversion of federal highways to four- and six-lane design also promotes the development of interregional connections and makes travel within the country convenient and attractive for everyone.

"The development of domestic tourism is driving a large-scale modernization of the federal road network, where a systematic conversion from two to four or more lanes transforms interregional routes into comfortable tourist corridors. In 2025 alone, eight key roadway widening projects were commissioned on Rosavtodor's federal road network as part of the reconstruction. This work will continue this year. Plans also call for the opening of another eight such projects, totaling 76.5 km, after the reconstruction. This will not only improve travel speeds along key transport arteries and the quality of service infrastructure, but also create truly attractive conditions for millions of Russians, who will be able to discover the incredible beauty of their country with a high level of safety and comfort," said Transport Minister Andrei Nikitin.

An integrated approach to work ensures safety and comfort for all road users.

"Rosavtodor is systematically expanding federal highways to four or more lanes in all regions of the country. In 2025, key projects included sections of the R-158 in the Nizhny Novgorod Region, the M-2 in the Oryol Region, the M-5 in the Chelyabinsk Region, the A-181 in the Leningrad Region, and many others. The work on these projects was comprehensive: in addition to widening and resurfacing, road workers constructed interchanges and installed transition and acceleration lanes, medians and side barriers, installed local wastewater treatment plants, lighting systems, and noise barriers. This approach is aimed at the most important thing—preserving the lives and health of all road users," noted Roman Novikov, head of the Federal Road Agency.

In the Oryol region, over 15 kilometers of the M-2 "Crimea" federal highway, from km 422 to 437, were widened to four lanes during major repairs. Here, specialists not only widened the roadway but also straightened the longitudinal profile and separated oncoming traffic with barriers. Bus stops, electric lighting lines, sidewalks, pedestrian crossings, and traffic lights were installed. New culverts, gutters, and ditches were installed to ensure stormwater drainage.

Similar work was carried out on a 9-kilometer section of the M-2 "Crimea" highway in the Tula region – on the northern approach to Tula.

In the Voronezh Region, a section of the R-298 Kursk-Voronezh highway, from km 196 to 209, has been widened to four lanes. Following the overhaul, the total width in both directions has increased to 14 meters.

In anticipation of the 80th anniversary of Victory in the Great Patriotic War, federal road workers reopened sections of the M-9 "Baltia" federal highway in the Tver and Moscow regions after major repairs. The entire route from Moscow to the Rzhev Memorial to the Soviet Soldier now has four or more lanes.

In the Nizhny Novgorod Region, 23 km of the federal highway R-158 Nizhny Novgorod – Saratov was converted to four-lane as part of a major overhaul. From km 77 to km 104, transitional/express lanes were installed at 11 junctions of local roads, and 12 bus stops with access bays and sidewalks were added near populated areas and summer cottage communities. One of the key solutions was the construction of five single-level interchanges, providing convenient U-turns and safe changes of direction.

In the Penza Region, a section of the R-208 Tambov-Penza federal highway (from km 147 to 157) widened to four lanes was opened to traffic ahead of schedule. The major repairs upgraded the road's category from category three to category two, more than doubling its capacity.

In the Omsk region, approximately 10 km of the R-254 Irtysh Highway (the southern bypass of Omsk) has been widened to four lanes. At the major overhaul site, specialists separated oncoming traffic flows with a central metal barrier, installed three turning loops, and installed 314 lighting poles.

In the Chelyabinsk region, a 14-kilometer section of the M-5 "Ural" highway (from km 1564 to 1578) was widened from two to four lanes as part of a reconstruction project. Drilling and blasting operations were a key part of the reconstruction. These were necessary to smooth out existing elevation changes and change the road's landscape.

In the Leningrad Region, the section between kilometers 124 and 130 of the A-181 "Scandinavia" highway was widened from two to six lanes. In addition, federal road workers built a two-level interchange, an overpass at the intersection with the regional Ogonki-Streltsovo-Tolokonnikovo road, and a six-lane bridge over the Perovka River.

In the Chechen Republic, the southern approach to Grozny, part of the R-217 "Kavkaz" highway, has been upgraded to a four-lane road. The roadway has been widened from 7 to 14 meters between kilometers 0 and 8.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: The average daily silver trading volume on the Moscow Exchange exceeded five tons for the first time.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

The average daily silver spot trading volume on the Moscow Exchange precious metals market during the first week of January 2026 was 5.4 tonnes, the highest level ever recorded. By comparison, this figure for 2025 was 1.3 tonnes.

The total spot silver trading volume for the first ten trading days of January of this year amounted to 43 tonnes, more than double the volume for all of January 2025. In monetary terms, trading volume for this period quadrupled compared to the volume for all of January last year, reaching 9.4 billion rubles.

Retail investors account for 61% of spot silver transactions this month. Since the beginning of 2025, individuals have already concluded over 35,000 silver transactions on the Moscow Exchange, totaling 5.1 billion rubles.

Moscow Exchange launched Russia's first delivery trading of precious metals in October 2013. An instrument with a trading code SLVRUB_TOM makes it possible to conduct transactions with silver, secured by physical metal in the vault.

The volume of spot and swap transactions involving silver on the Moscow Exchange precious metals market in 2025 amounted to 52 billion rubles (365 tonnes). The total volume of transactions on the precious metals market tripled last year, exceeding 3 trillion rubles.

On precious metals market Moscow Exchange offers investors access to gold, silver, platinum, and palladium trading. Trading and settlement are conducted in rubles through the National Clearing Center, a central counterparty, allowing participants to take advantage of a modern risk management system and secure settlements. Precious metals are delivered anonymously to the metal accounts of clearing participants.

Contact information for media: 7 (495) 363-3232PR@moex.com

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 01/22/2026, 11:28 (Moscow time) the values of the upper limit of the price corridor and the range of market risk assessment for security RU000A0JS4L7 (WHSD 05) were changed.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

January 22, 2026

11:28

In accordance with the Methodology for determining the risk parameters of the stock market and deposit market of PJSC Moscow Exchange by the National Credit Center (JSC) on 22.01.2026, 11:28 (Moscow time), the values of the upper limit of the price corridor (up to 131.26) and the range of market risk assessment (up to 1620.18 rubles, equivalent to a rate of 62.5%) of the security RU000A0JS4L7 (ZSD 05) were changed.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 01/22/2026, 11:27 (Moscow time) the values of the upper limit of the price corridor and the range of market risk assessment for security RU000A109916 (Rostel P10R) were changed.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

January 22, 2026

11:27

In accordance with the Methodology for determining the risk parameters of the stock market and deposit market of PJSC Moscow Exchange by the National Credit Center (JSC) on 22.01.2026, 11-27 (Moscow time), the values of the upper limit of the price corridor (up to 108.11) and the range of market risk assessment (up to 1155.79 rubles, equivalent to a rate of 8.75%) of the security RU000A109916 (Rostel P10R) were changed.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 01/22/2026, 10:53 (Moscow time) the values of the upper limit of the price corridor and the range of market risk assessment for the RU000A0ZYFM5 security (DOM.RF B-8) were changed.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

January 22, 2026

10:53

In accordance with the Methodology for determining the risk parameters of the stock market and deposit market of PJSC Moscow Exchange by the NCC (JSC) on January 22, 2026, 10:53 (Moscow time), the values of the upper limit of the price corridor (up to 105.52) and the range of market risk assessment (up to 1123.06 rubles, equivalent to a rate of 7.5%) for the security RU000A0ZYFM5 (DOM.RF B-8) were changed.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Marat Khusnullin: More than 2,000 projects and events have been completed in Russia thanks to infrastructure menu tools.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Since 2021, regions have received the "Infrastructure Menu" financial support package, launched by the government to create comfortable living conditions for residents. These instruments include infrastructure budget loans (IBK), special treasury loans (STL), treasury infrastructure loans (TIL), concessional loans from the National Welfare Fund (NWF), and infrastructure bonds.

"The regional development instruments launched by the Government are consistently yielding positive results. Thanks to the infrastructure menu mechanisms, schools and clinics, roads and bridges are being built, housing and utilities systems are being modernized, public transportation is being updated, and tourism infrastructure, industrial technology parks, and special economic zones are being created. All these measures contribute to improving the standard of living of Russians. Since 2021, approximately 2,200 facilities and events have been commissioned and completed in the regions using infrastructure loans, preferential loans from the National Welfare Fund, and infrastructure bonds, as well as over 8,300 new units of public transportation," noted Deputy Prime Minister Marat Khusnullin.

The Ministry of Construction acts as the curator of infrastructure development programs within the infrastructure menu.

"We have allocated a total of 1 trillion rubles through the IBC to 83 regions for the implementation of more than 960 projects. By 2040, this is expected to enable the commissioning of 120 million square meters of housing, create over 498,000 jobs, attract over 10.9 trillion rubles in extra-budgetary investment, and ensure budget revenues of over 2.3 trillion rubles in taxes and non-tax payments. Furthermore, 190 billion rubles from the IBC funds have been allocated to 79 regions for the implementation of 579 projects and activities. Financing for 84 regions totaling almost 360 billion rubles in the form of CFCs has also been approved. These funds will be used to implement 257 projects. Work on reviewing applications from the regions is ongoing. "Overall, between 2025 and 2030, we plan to provide regions with 1 trillion rubles in treasury infrastructure loans," emphasized First Deputy Minister of Construction, Housing and Utilities Alexander Lomakin.

The public-law company "Territorial Development Fund" is the operator of the program for the modernization of municipal infrastructure using preferential loans from the National Welfare Fund, and also participates in the implementation of the infrastructure loan program.

"To date, 984 projects and activities have been completed in Russia using infrastructure loans (650 under the IBC, 316 under the SKK, and 18 under the KIK) in the areas of utilities, social infrastructure, road construction, and other infrastructure vital to citizens. Furthermore, under the housing and utilities modernization program using funds from the National Welfare Fund, 1,174 projects have been commissioned in the regions since 2022, including over 1,400 kilometers of utility networks and 278 site-specific projects," said Vasily Kupyzin, CEO of the Territorial Development Fund.

The housing and utilities modernization program, using funds from the National Welfare Fund, provides preferential loans totaling 150 billion rubles to 76 regions for the implementation of 258 projects.

DOM.RF is currently implementing infrastructure bond projects in 29 regions. The amount of preferential loans under these projects is 200 billion rubles. To date, 33 projects have been commissioned, including four transport infrastructure projects, five road infrastructure projects, 17 utility infrastructure projects, five social infrastructure projects, and two tourism infrastructure projects.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.