Shanghai reports growth in auto and EV production in Jan-July

Translation. Region: Russian Federal

Source: People's Republic of China in Russian – People's Republic of China in Russian –

An important disclaimer is at the bottom of this article.

Source: People's Republic of China – State Council News

SHANGHAI, Sept. 5 (Xinhua) — East China's Shanghai auto industry continued to grow steadily in the first seven months of this year, producing vehicles worth 391.12 billion yuan (about 55 billion U.S. dollars), with a year-on-year comparable growth rate of 10.6 percent.

Notably, more than 160,000 new energy vehicles (NEVs) were sold in the eastern Chinese metropolis during the period, up 19.9 percent from a year earlier, the city's Economics and Information Technology Committee reported.

According to the department, the total production volume of finished vehicles in Shanghai during the reporting period amounted to 938 thousand units, of which NEVs were 573 thousand units, or 61.1 percent of the city's total automobile production.

Shanghai has been actively promoting technological innovation in the intelligent connected vehicle sector and industry development. To date, it has issued road test and demonstration licenses to 902 vehicles belonging to 40 companies.

The total test mileage of such vehicles in the city has exceeded 29.3 million km. Shanghai has also opened 1,586 test roads for intelligent connected vehicles with a total length of 2,767 km. -0-

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

.

American teacher Emily: My dream is to travel all over China

Translation. Region: Russian Federal

Source: People's Republic of China in Russian – People's Republic of China in Russian –

An important disclaimer is at the bottom of this article.

Source: People's Republic of China – State Council News

Emily Francis from the United States is an English teacher at Hebei Normal University. She married a Chinese man and has lived in Hebei Province for eight years. Emily not only carries out cultural exchanges with her students through teaching, but also actively learns about daily life in China. As an experienced traveler, she has visited many places of interest. In the future, Emily wants to travel all over China, learn more about traditional Chinese crafts, and introduce China to as many people as possible through the videos she makes and posts.

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

.

NSU student took part in international speleological expedition to Uzbekistan

Translation. Region: Russian Federal

Source: Novosibirsk State University –

An important disclaimer is at the bottom of this article.

Ilona Vladimirova, second year student Faculty of Geology and Geophysics, NSU, took part in an international speleological expedition to the Gissar Range in Uzbekistan this summer. For twenty days, a team of 34 researchers from Russia, Uzbekistan, Turkey, Israel and the United States studied the largest caves in the region – Boy-Bulok and Vishnevsky.

The main objective of the expedition was to find a connection between the Boy-Bulok and Vishnevsky caves, conduct a topographic survey of the Boy-Bulok cave passages, explore an ice cave at an altitude of 3,700 m, and refine the topographic survey of the Khodja-Gur-Gur-Ata massif caves. In addition, more specific tasks were also solved: installing a hydrogenerator in the underground base camp (UBC) at a depth of -560 m to generate electricity, organizing communication between the caves using the Nicola device, delivering ground penetrating radars to both caves, and measuring the distance between the closest points, as well as other studies.

Ilona worked as part of a team at the Chulbair massif. The speleologists managed to pass a narrow section in the Boy-Bulok cave and explore a new clay passage about 70 meters long, which allowed them to refine the topographic survey data and increase the amplitude of the cave depth by another 6 meters.

— It was not easy, since the route through the cave has the fourth category of complexity. However, I really enjoyed life underground in PBL-560, where I spent three nights (some participants lived there for up to 14 nights). But the most pleasant thing was to come to the surface. It was very beautiful. We met the sunset on the edge of the Chulbair wall at an altitude of 3,700 meters, looking down at a four-hundred-meter cliff. I also remember the volleyball match in the Uzbek village of Dekhibolo between locals and cavers, in which friendship won, — Ilona shares her impressions.

In addition to research in Boy-Bulok, the expedition examined an ice cave at an altitude of 3,700 m, where bears' beds were discovered, and also carried out work on the Khodja-Gur-Gur-Ata massif.

Ilona admits that she would like to return to Uzbekistan to continue searching for the connection between the two largest caves.

The expedition was organized by the Sverdlovsk city speleosection under the leadership of Vadim Loginov, who has been conducting research in this area since 2007.

Material prepared by: Yulia Dankova, NSU press service

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

.

Today is a special day in the history of Moscow transport – the first completely driverless tram in Russia has been launched.

Translation. Region: Russian Federal

It will transport passengers in the northwest of the city on route No. 10 “Metro Shchukinskaya – Ulitsa Kulakova” and will operate on the established schedule.

This is a very significant technological milestone. Now unmanned technologies are starting to be implemented in the capital's transport.

The software for the driverless tram was created by the Moscow Metro employees without involving third-party companies. The smart technology developed by the city is unique. It works more accurately and reliably than foreign analogues. It has already been recognized with prestigious international awards.

The unmanned tram traveled more than 8 thousand km in test mode without violating traffic rules even once.

It is equipped with a sensor system, a high-precision route map and systems for localization, computer vision, motion planning, and wheel slip prevention.

As a result, the tram stops where necessary, opens and closes its doors, follows traffic lights, lets pedestrians pass, independently determines how to cross an intersection, switches switches, and adheres to the schedule.

The tram control officer is currently in the cabin or passenger compartment as required by federal law only for observation, and he does not interfere with the process.

Future plans:

By the end of the year, three more trams will be equipped with driverless technology. By 2030, there will be more than 300, which is about 2/3 of the capital's fleet. It is expected that by 2035, about 90% of Moscow trams will operate using driverless technology.

In December, the first stage of pilot operation of the first unmanned metro train in Russia on the BCL will begin. The control system will be tested on a modern train of the “Moscow” series at night without passengers.

Dmitry Chernyshenko and Valery Falkov congratulated the St. Petersburg State University team on their victory in the ICPC World Championship in competitive programming in Baku

Translation. Region: Russian Federal

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

The team of Saint Petersburg State University won the world championship in sports programming ICPC. The final was held in Baku.

A total of four teams were among the championship's gold medalists. The absolute victory in the competition was won by the team of students from St. Petersburg State University consisting of Maxim Turevsky, Leonid Danilevich and Fyodor Ushakov. The team was trained by Ivan Kazmenko, a coach at St. Petersburg State University in programming.

"We congratulate our students on this triumphant victory! ICPC is considered the most prestigious programming competition among students. And it was our students who became the best among participants from more than 70 countries and about 140 universities around the world, including Harvard and MIT. We are proud that students of different levels – both schools and universities – regularly return from international Olympiads and championships with medals. This allows us to confidently call them world-class masters!" – noted Deputy Prime Minister Dmitry Chernyshenko.

The Deputy Prime Minister also thanked the team’s mentors and teachers from St Petersburg State University for their contribution to the development of the winners’ skills and knowledge.

"Winning gold at such a prestigious competition is a significant achievement, recognition of high skill and well-coordinated teamwork. It is such goal-oriented, brilliantly prepared young minds that determine the future of Russia. Our task is to continue to do everything possible to create conditions in which students can reveal their talents, including in the field of information technology," emphasized the head of the Ministry of Education and Science, Valery Falkov.

The main goal of the championship participants was to solve algorithmic problems of varying degrees of complexity using code in a limited time, making a minimum of mistakes and making as few incorrect attempts as possible. The SPbU team solved 11 problems out of 12 in the allotted five hours, ahead of other participants by a large margin.

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

Alexander Novak: Providing the Far Eastern Federal District with energy infrastructure is our priority

Translation. Region: Russian Federal

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Deputy Prime Minister Alexander Novak took part in a meeting on the development of the fuel and energy complex of the Far Eastern Federal District, which was held at the Eastern Economic Forum (EEF) under the leadership of President Vladimir Putin. The meeting was also attended by members of the Government, heads of Far Eastern regions and fuel and energy companies.

The participants discussed the progress of preparing a program for the development of energy capacities in the Far East for the period up to 2050 in the context of the accelerated development of the region’s economy and the growth of its energy consumption.

"The discussion was about the development of energy, gas infrastructure, oil and gas enterprises. Based on the results of the last five years, we have seen a 3.8% increase in energy consumption in the Far East, which is 2% higher than the average in Russia. In the future, this trend will continue. Therefore, it is important to ensure the accelerated development of infrastructure, the construction of generating capacities, power transmission lines," Alexander Novak noted in an interview with the Russia 24 TV channel at the EEF following the meeting.

According to the Deputy Prime Minister, 5.7 thousand MW of capacity will be built for the Far East: 1564 MW of which will be solar power plants, and about 4 thousand MW will be gas and coal thermal power plants.

The government has decided to build additional power plants with a total capacity of 2.5 thousand MW by 2030 and 2 thousand power transmission lines, and the total investment in the electric power infrastructure of the Far Eastern Federal District will amount to about 3 trillion rubles.

“Providing the Far Eastern Federal District with energy infrastructure is our priority,” the Deputy Prime Minister emphasized.

The President instructed to pay special attention to the diversification of the Far East energy sector. This concerns the development of coal generation in the context of the availability of coal reserves for 900 years ahead, the construction of large nuclear power plants and small nuclear generation, as well as the implementation of the region's hydro potential. Instructions were also given in the area of developing gas fields to provide the region with gas, taking into account its growing needs and the implementation of Russia's export obligations.

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

Marat Khusnullin: Another 37 projects have been approved under treasury infrastructure loans totaling over 46 billion rubles

Translation. Region: Russian Federal

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Marat Khusnullin held a meeting of the presidium (headquarters) of the Government Commission on Regional Development.

Deputy Prime Minister Marat Khusnullin held a meeting of the presidium (headquarters) of the Government Commission on Regional Development. Following the meeting, the commission members approved the financing of a number of projects using funds raised through the mechanism of treasury infrastructure loans (TIL).

"We continue to consider projects for which treasury infrastructure loans will be allocated. We have distributed a little more than 46 billion rubles for 138 facilities and events as part of 37 projects in 14 regions. These are mainly housing and communal services, including the construction and reconstruction of water supply and sanitation systems, as well as a large application for the purchase of 165 railcars for the Central Transport Hub. In addition, a separate pool of CICs are projects within the framework of the competitive selection. The total limit for the competition is 196.6 billion rubles for the next six years, of which projects within the first stage are worth 76.4 billion rubles. The headquarters reviewed 15 projects that can be recognized as winners, from 13 regions. All of them are directly related to improving the quality of life of our citizens. The implementation of the approved initiatives will create a modern and comfortable environment, improve transport and communal infrastructure, which will ultimately affect the well-being of people in the regions. I would like to emphasize that achieving the target indicators for implementation in the CIC program is a key and strictly controlled parameter, since we are talking about the effective use of funds and the fulfillment of social obligations to citizens,” noted Marat Khusnullin.

New approved CFC limits will be received by Moscow (30 billion rubles), Sevastopol (834.52 million rubles), the Republic of Crimea (1.64 billion rubles), the Trans-Baikal Territory (849.56 million rubles), the Ryazan Region (927.77 million rubles), the Republic of Ingushetia (233.15 million rubles), Belgorod (1.58 billion rubles), Bryansk (2.38 billion rubles), Oryol (501.53 million rubles), Ulyanovsk (1.01 billion rubles), Orenburg (2.47 billion rubles) regions, as well as the Donetsk People's Republic (1.89 billion rubles), Lugansk People's Republic (1.31 billion rubles) and Zaporozhye Region (514.39 million rubles).

In addition, the meeting began to summarize the results of the competitive selection of infrastructure projects to receive treasury infrastructure loans. From the list of projects-applicants that received a high final assessment, 15 projects in 13 regions for a total of about 60.2 billion rubles were considered.

Among them are Saint Petersburg (13.1 billion rubles), Perm Krai (6.66 billion rubles), Samara Oblast (674.9 million rubles), Omsk Oblast (6.8 billion rubles), the Republic of Dagestan (461.9 million rubles), the Karachay-Cherkess Republic (4.27 billion rubles), the Yamalo-Nenets Autonomous Okrug (7 billion rubles), the Republic of Bashkortostan (5 billion rubles), the Udmurt Republic (315 million rubles), Primorsky Krai (3.2 billion rubles), Irkutsk Oblast (3.69 billion rubles), Nizhny Novgorod Oblast (7.51 billion rubles) and Saratov Oblast (1.5 billion rubles).

In total, 83 projects from 42 regions were admitted to the competitive selection for a total amount of approximately 221 billion rubles.

First Deputy Minister of Construction and Housing and Public Utilities Alexander Lomakin reported on the review of applications from regions to participate in the selection of infrastructure projects for implementation using CIC funds.

"82 regions have submitted applications for basic housing and utilities limits. 72 applications have already been approved for a total of almost 164 billion, and another 3 applications for a total of about 4.3 billion are at a high level of readiness. Infrastructure projects that are planned to be implemented with the involvement of treasury infrastructure loans are socially significant for the regions and are aimed at achieving the goals of the national project," said Alexander Lomakin.

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 09/05/2025 JSC “SME Corporation” will hold a deposit auction.

Translation. Region: Russian Federal

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

Parameters:

Date of the deposit auction 09/05/2025. Placement currency RUB. Maximum amount of funds placed (in the placement currency) 1,910,000,000. Placement term, days 32. Date of depositing funds 09/05/2025. Date of return of funds 10/07/2025. Minimum placement interest rate, % per annum 17. Terms of the conclusion, urgent or special (Urgent). Minimum amount of funds placed for one application (in the placement currency) 1,910,000,000. Maximum number of applications from one Participant, pcs. 1. Auction form, open or closed (Open).

The basis of the Agreement is the General Agreement. Schedule (Moscow time). Preliminary bids from 10:30 to 10:40. Competitive bids from 10:40 to 10:50. Setting the cutoff percentage or declaring the auction invalid before 11:30. Additional terms.

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 09/04/2025, 17:58 (Moscow time) the values of the upper limit of the price corridor and the range of market risk assessment for the security RU000A0ZYJ91 (FSK RS B4) were changed.

Translation. Region: Russian Federal

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

04/04/2025

17:58

In accordance with the Methodology for determining the risk parameters of the stock market and deposit market of Moscow Exchange PJSC by NCO NCC (JSC) on September 4, 2025, 17:58 (Moscow time), the values of the upper limit of the price corridor (up to 106.17) and the range of market risk assessment (up to 1096.29 rubles, equivalent to a rate of 7.5%) of the security RU000A0ZYJ91 (FSK RS B4) were changed.

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 09/04/2025, 15:59 (Moscow time) the values of the upper limit of the price corridor and the range of market risk assessment for the SU26231RMFS9 security (OFZ 26231) were changed.

Translation. Region: Russian Federal

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

04/04/2025

15:59

In accordance with the Methodology for determining the risk parameters of the stock market and deposit market of Moscow Exchange PJSC by NCO NCC (JSC) on September 4, 2025, 15:59 (Moscow time), the values of the upper limit of the price corridor (up to 15.6) and the range of market risk assessment (up to 180.08 rubles, equivalent to a rate of 50.0%) of the SU26231RMFS9 security (OFZ 26231) were changed.

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.