Financial news: On 2025-11-07, the Federal Treasury will hold a deposit auction of 22,025,361.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

Application selection parameters;

Application selection date 07.11.2025. Unique application selection identifier 22 025 361. Deposit currency rubles. Fund type EKS. Maximum amount of funds placed on bank deposits, monetary units 50,000,000,000. Placement term, in days 182. Date of depositing funds 07.11.2025. Date of return of funds 08.05.2026. Interest rate for placement of funds (fixed or floating). Single treasury account. Minimum fixed interest rate for placement of funds, % per annum – Basic floating interest rate for placement of funds FLOATING_RUONmDS. Minimum spread, % per annum 0.

Terms and conditions of a bank deposit agreement (fixed-term, replenishable, or special) Fixed-term. Minimum amount of funds placed per application, in monetary units: 1,000,000,000. Maximum number of applications from one credit institution, pcs. 2. Application selection form (Open with random completion, Closed, Open with extension) Open with extension. Application selection schedule (Moscow time). Application selection venue: Moscow Exchange PJSC. Applications will be accepted from 09:30 to 10:30. Applications in preliminary mode from 09:30 to 09:35. Applications in competition mode from 10:25 to 10:30. Random trading end period (sec.): 0. Bid step: 0.1. Time step (sec.): 60.

Extension period end time: 11:00:00. Formation of the consolidated register of applications: from 11:00 to 11:30. Setting the cutoff interest rate and (or) recognizing the selection of applications as unsuccessful: from 11:00 to 11:40. Sending an offer to credit institutions to conclude a bank deposit agreement: from 11:40 to 13:00. Receipt of acceptance of the offer to conclude a bank deposit agreement from credit institutions: from 11:40 to 13:00. Deposit transfer time In accordance with the requirements of paragraphs 63 and 64 of the Order of the Federal Treasury dated April 27, 2023 No. 10n

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: On 2025-11-07, the Federal Treasury will hold a deposit auction of 22,025,360 rubles.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

Application selection parameters;

Application selection date: 07.11.2025. Unique application selection identifier: 22,025,360. Deposit currency: rubles. Fund type: EKS. Maximum amount of funds placed on bank deposits, in monetary units: 100,000,000,000. Placement period, in days: 14. Date of deposit: 07.11.2025. Date of return: 21.11.2025. Interest rate for placement of funds (fixed or floating). Single treasury account. Minimum fixed interest rate for placement of funds, % per annum – Basic floating interest rate for placement of funds FLOATING_RUONmDS Minimum spread, % per annum: 0.

Terms and conditions of a bank deposit agreement (fixed-term, replenishable, or special)Fixed-term. Minimum amount of funds placed per application, in monetary units: 1,000,000,000. Maximum number of applications from one credit institution, pcs. 2. Application selection form (Open with random completion, Closed, Open with extension)Open with extension. Application selection schedule (Moscow time). Application selection venue: Moscow Exchange PJSC. Application acceptance: from 09:30 to 09:50. Applications in preliminary mode: from 09:30 to 09:35. Applications in competition mode: from 09:45 to 09:50. Random trading end period (sec.): 0. Bid step: 0.1. Time step (sec.): 60.

The extension period ends at 10:20:00. Formation of the consolidated register of applications: from 11:00 to 11:30. Setting the cutoff interest rate and (or) recognizing the selection of applications as unsuccessful: from 11:00 to 11:40. Sending an offer to credit institutions to conclude a bank deposit agreement: from 11:40 to 13:00. Receipt of acceptance of the offer to conclude a bank deposit agreement from credit institutions: from 11:40 to 13:00. The time of deposit transfer in accordance with the requirements of paragraphs 63 and 64 of the Order of the Federal Treasury dated April 27, 2023 No. 10n

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: On 2025-11-07, the Federal Treasury will hold a deposit auction of 22,025,359 rubles.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

Application selection parameters:

Application selection date 07.11.2025. Unique application selection identifier 22 025 359. Deposit currency rubles. Fund type EKS. Maximum amount of funds placed on bank deposits, monetary units 2 50 000 000 000. Placement period, in days 4. Date of depositing funds 07.11.2025. Date of return of funds 11.11.2025. Interest rate for placement of funds (fixed or floating). Single treasury account. Minimum fixed interest rate for placement of funds, % per annum 15.76. Base floating interest rate for placement of funds – Minimum spread, % per annum – Terms and conditions of the bank deposit agreement (term, replenishable or special) Term. The minimum amount of funds placed per application, in monetary units, is 1,000,000,000. The maximum number of applications from one credit institution, pcs. 2. Application selection form (Open with random completion, Closed, Open with extension) Open with random completion.

Order selection schedule (Moscow time). Order selection venue: Moscow Exchange PJSC. Order acceptance: from 09:30 to 09:40. Preliminary orders: from 09:30 to 09:35. Competition orders: from 09:35 to 09:40. Random bidding period (sec.): 120Bid increment:

Time step (sec.):

Extension period end time:

Formation of the consolidated register of applications: from 11:00 to 11:30. Setting the cutoff interest rate and (or) recognizing the selection of applications as unsuccessful: from 11:00 to 11:40. Sending an offer to credit institutions to conclude a bank deposit agreement: from 11:40 to 13:00. Receipt of acceptance of the offer to conclude a bank deposit agreement from credit institutions: from 11:40 to 13:00. Deposit transfer time In accordance with the requirements of paragraphs 63 and 64 of the Order of the Federal Treasury dated April 27, 2023 No. 10n.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Yuri Trutnev: Technological development in the Far East must proceed faster.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Deputy Prime Minister and Presidential Plenipotentiary Envoy to the Far Eastern Federal District Yuri Trutnev held a meeting on the technological and industrial development of Khabarovsk Krai and learned about the Aero-Hit company's unmanned aerial vehicle (UAV) production project.

"Khabarovsk Krai is a development leader among the Far Eastern regions. 156 investment projects with a total investment volume of over 2.7 trillion rubles are being implemented here with state support. The region ranks second in the Far East in terms of attracted investment and first among the Far Eastern regions in terms of industrial index. Today, we have gathered to discuss the issue of technological development. Dmitry Viktorovich Demeshin and I have already visited one of the enterprises – a production facility of the Aero-Hit company – where, in general, technological development can be confidently discussed. Clearly, this is not the only point of development in the region. Among the region's leading enterprises are the Komsomolsk-on-Amur Aircraft Plant named after Yuri Gagarin, the Amur Shipyard, and others. I am confident that the current pace and existing enterprises are insufficient to ensure the technological development of our country. They must be accelerated," Yuri Trutnev opened the meeting.

Khabarovsk Krai Governor Dmitry Demeshin reported on the region's technological development. "Khabarovsk Krai's industrial specialization is evident (over 21% of the gross regional product). The region's main specialization industries are aircraft and shipbuilding, metallurgy, energy production, petroleum product manufacturing, and construction. The industrial production index for January-September demonstrated stable growth, growing by 18.5%. This growth was driven by the launch of new investment projects and the robust performance of the manufacturing industry (105.2%)," he noted.

The Khabarovsk Krai has launched the Charter of Industrial Technological Sovereignty and Import Substitution. It includes the formation of cooperative ties between small technology companies around the region's large industrial enterprises, support for import-substitution projects, the digital transformation of industrial sectors, and the development of human resources. Over the past year, 386 organizations in the region have joined the charter. 274 contracts have been signed between small and large businesses.

Work has begun to establish a cluster-based industrial development system. Priority clusters in the first stage include aircraft manufacturing, shipbuilding, mining, agro-industrial complex, industrial construction, high-tech, and tourism. Helicopter manufacturing, metallurgy and metalworking, and forestry are also promising. The region's core specializations—aircraft and shipbuilding—are a clear priority. Regional authorities, together with UAC, are forming an aircraft manufacturing cluster. Plans call for localization of SJ-100 components and the creation of production sites that will consolidate the production of hatches, doors, and PD-8 engines.

Engineering and reverse engineering are fueling growing cooperative chains between small and large businesses. Regional technology companies, including Prommash, PAKS-Vostok, SKIF-M DV, Kompozit-DV, Yakovlev, and others, have been involved in cooperation in aircraft manufacturing.

In the future, the Far East and Arctic Development Corporation and JSC Helicopter Service Company are working together to establish a helicopter cluster in Khabarovsk. An agreement was signed at the Eastern Economic Forum to establish a Service Competence Center specializing in helicopter repair, maintenance, and component production at JSC Far Eastern Aviation Service Center as the first stage of the helicopter cluster.

The development of shipbuilding was discussed. This traditional industry specialization in Khabarovsk Krai is based at two enterprises – the Amur and Khabarovsk shipyards. The meeting considered the possibility of expanding the range of civilian orders for the Amur shipyard, including the construction of multifunctional rescue vessels with enhanced ice class. A shipbuilding cluster in the form of an industrial park is being formed at the Khabarovsk shipyard. Preliminary agreements have been reached with potential residents.

"We are developing a shipbuilding cluster where we expect to produce vessels for the needs of both the region and the entire Far East. These include cargo ships, tugboats, and passenger vessels, including hydrofoils," the Khabarovsk Krai Governor explained.

According to Dmitry Demeshin, a program for developing shipping in the Amur Basin has been developed at the direction of Yuri Trutnev. The program was discussed at the regional Maritime Council and presented at a roundtable discussion in the Federation Council.

Proposals have been made to establish an automotive cluster in Khabarovsk Krai. VEB.RF previously supported funding for the Far Eastern Bus Cluster project. The first phase is planned to launch an assembly facility at the Vector site (Khabarovsk Priority Development Area). A 24,000 square meter facility has been allocated for the project to assemble Amurbus city, tourist, and apron buses. In the second phase, component production will begin at the Rakitnoye site.

Promising areas were presented, including proposals to form a metallurgical cluster based on the only metallurgical complex in the Far East, Amurstal, the creation of a high-tech cluster, and the development of the petrochemical industry.

"We must move forward as quickly as possible. We must keep up with the world's technologies. Yes, there are certain areas of technological development in which Russia is not only keeping pace, but ahead of others. But we also cannot remain stagnant," Yuri Trutnev concluded the meeting.

That same day, the Deputy Prime Minister visited the Aero-Hit plant in the Khabarovsk priority development area, which produces the Veles small attack and reconnaissance UAV. The plant's products are supplied to the Russian Ministry of Defense as part of a special military operation. Since 2023, the company has delivered over 50,000 military modular FPV drones to the special military operation zone.

Drones produced by the TOR resident are being improved to meet the needs of fighters in the Northern Military District. For the latest version of the UAV, the company's employees equipped it with fiber-optic communications for high-speed data transmission in remote control and surveillance systems, artificial intelligence with the Soroka and Stratim targeting systems, enabling precise target engagement even in active countermeasures, thermal imaging and night vision cameras for nighttime operation, and modular designs that can be adapted for reconnaissance, strike, or assault team support missions. The new Veles-17 model, with a payload capacity of up to 10 kg and a range of 25 km, is already undergoing testing in the Northern Military District.

In addition to production, the company has established a network of technical support and service centers for after-sales service and modernization of manufactured products, and has opened its own UAV development laboratory.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: On November 7, 2025, JSC KAVKAZ.RF will hold a deposit auction.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

Parameters;

The deposit auction date is November 7, 2025. The placement currency is RUB. The maximum amount of funds placed (in the placement currency) is 214,000,000. Placement period, days – 45. The date of depositing funds is November 10, 2025. The date of return of funds is December 25, 2025. The minimum placement interest rate, % per annum is 16.2. Terms of the conclusion, urgent or special (Urgent). The minimum amount of funds placed for one application (in the placement currency) is 214,000,000. The maximum number of applications from one Participant, pcs. 1. Auction form, open or closed (Open).

The basis of the Agreement is the General Agreement. Schedule (Moscow time). Preliminary bids from 10:00 to 10:10. Competitive bids from 10:10 to 10:15. The cutoff percentage may be set or the auction may be declared void by 10:25. Additional terms and conditions.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: Update of the DKO market system interface.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

In continuation news We inform you about changes in the stock and currency market system planned for December 8, 2025.

An updated version of the GKO15 broker gateway interface will be available starting December 1, 2025. A new integer field, AUC_ID (Application Selection Identifier), has been added to the SECURITIES table. It is populated with the unique deposit auction identifier transmitted by the Federal Treasury to the Exchange.

A description of the new interface version is available on the Exchange's FTP server: http://ftp.moex.com/pub/KlintsAPI/ASC/Bridge_Interfaces/Treasors/test.

Contact information for media: 7 (495) 363-3232PR@moex.com

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

The government has approved the procedure for providing tax deductions to investors within the framework of the SPZPK mechanism.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Document

Resolution of October 31, 2025 No. 1709

Comment

From Mikhail Mishustin's opening remarks at the Government meeting, November 6, 2025

The government has improved the mechanism for investment protection and promotion agreements (IPPAs), allowing organizations implementing investment projects to receive reimbursement for their expenses in the form of a tax deduction. A resolution has been signed on the procedure for providing this form of state support.

The decision will launch a mechanism for reimbursing expenses in the form of tax deductions for the creation, modernization, and reconstruction of transport, energy, utilities, social, and digital infrastructure facilities necessary for the implementation of investment projects.

The tax deduction will be applied to income tax, property tax, and land tax paid in connection with the project. It will amount to up to 50% of the costs of constructing supporting infrastructure facilities used to implement the investment project, and up to 100% of the costs of supporting infrastructure facilities. The deduction amount must not exceed the amount of taxes paid. To qualify, companies must submit documents confirming the amount of expenses incurred to the Ministry of Economic Development.

The SPZPK mechanism, which guarantees unchangeable conditions for the implementation of major investment projects, was launched by the government in 2020, becoming one of the key instruments supporting investment activity. It enables businesses to maintain tax, land use, urban development, and government support measures even if they change nationwide, as well as partially reimburse infrastructure costs and interest on loans.

Announcing the decision takenGovernment meeting on November 6Mikhail Mishustin noted that in the five years since this mechanism was launched, approximately 80 such agreements have been concluded, totaling approximately 4.5 trillion rubles. Thirteen industrial facilities, worth a total of 700 billion rubles, have already been commissioned, creating over 8,000 jobs in more than 10 regions of the country.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 06.11.2025, 14-48 (Moscow time) the values of the upper limit of the price corridor and the range of market risk assessment for security RU000A106TV7 (VimpelK3R4) were changed.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

November 6, 2025

14:48

In accordance with the Methodology for determining the risk parameters of the stock market and deposit market of PJSC Moscow Exchange by the National Credit Center (JSC) on 06.11.2025, 14-48 (Moscow time), the values of the upper limit of the price corridor (up to 90.68) and the range of market risk assessment (up to 972.7 rubles, equivalent to a rate of 18.75%) for security RU000A106TV7 (VimpelK3R4) were changed.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 06.11.2025, 14-40 (Moscow time) the values of the upper limit of the price corridor and the range of market risk assessment for security RU000A10A6B8 (RusGid2P02) were changed.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

November 6, 2025

2:40 PM

In accordance with the Methodology for determining the risk parameters of the stock market and deposit market of PJSC Moscow Exchange by the NCC (JSC) on 06.11.2025, 14-40 (Moscow time), the values of the upper limit of the price corridor (up to 121.1) and the range of market risk assessment (up to 1330.15 rubles, equivalent to a rate of 26.25%) of the security RU000A10A6B8 (RusGid2P02) were changed.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Marat Khusnullin: More than 170 bridges and overpasses have been commissioned under the "Infrastructure for Life" national project.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Every November, Russia celebrates Bridge Day (Mostoden). Thanks to the national "Infrastructure for Life" project, large-scale construction, reconstruction, repair, and major overhaul of artificial structures continues on the regional and local road network. In the first 10 months of this year, 175 bridges and overpasses have been commissioned, according to Deputy Prime Minister Marat Khusnullin.

"Our strategic objective, in the context of growing motorization, increasing traffic volume, and increasing population mobility, is to ensure seamless logistics so that as many of our citizens as possible can use high-quality roads and convenient routes. Every artificial structure is an integral, and often key, element of the road framework that ensures uninterrupted transport connections. Today, it's important not just to renovate and build bridges and overpasses, but to do so systematically. This objective is being successfully addressed thanks to the national project 'Infrastructure for Life.' By the end of October, 175 artificial structures, with a total length of 12,400 linear meters, had been commissioned on the regional and local road network," said Marat Khusnullin.

Construction and installation work continues at other sites, many of which are at an advanced stage of readiness, and some bridges and overpasses are ready for commissioning.

"By the end of the year, under the 'Infrastructure for Life' national project, we will commission more than 560 artificial structures, totaling over 43,000 linear meters. These include construction, reconstruction, and repair projects, including major ones. Many structures haven't seen major repairs for decades, even though traffic volumes, and therefore the load on them, have increased significantly. These factors are being taken into account, and advanced technologies, solutions, and new materials are being used in construction and installation work," noted Transport Minister Andrei Nikitin.

Large-scale renovation and construction of bridge structures on the regional and local networks was made possible thanks to federal support.

"The smooth operation of bridges and overpasses directly impacts people's quality of life: this includes the delivery of goods, the passage of emergency services, the safe crossing of railway tracks, and much more. In 2025, 50.472 billion rubles have been allocated from the federal budget for the repair and construction of these structures," said Kairat Tursunbekov, Deputy Head of the Federal Road Agency.

In October 2025, on the sidelines of the 12th International Specialized Exhibition "Road 2025," traffic opened on a new overpass over the Trans-Siberian Railway in the village of Seryshevo in the Amur Region. The total length of the overpass, including access roads, is 3 km.

Construction of two more overpasses is also ongoing in the Amur Region. The overpass over the Trans-Siberian Railway in Novobureysky, funded by infrastructure bonds, is scheduled to open in December. The overpass in Belogorsk is scheduled to open in 2027 under the national project. Work is ahead of schedule.

In the Republic of Bashkortostan, the bridge over the Ik River has reopened to traffic after reconstruction. It is unique in that it straddles the border of two regions and two time zones. The bridge provides the shortest route for residents of Bashkortostan and Tatarstan, who use the Oktyabrsky-Urussu road daily to get to work, school, and clinics. Following the reconstruction, traffic on this road is expected to reach 4,000 vehicles per day. The work was completed ahead of schedule.

Another significant project in the republic this year is the bridge across the Bely Kamen (Uzyan) River on the Tolbazy-Krasnousolsky highway. The 39-linear-meter structure underwent a major overhaul.

In the Perm Krai, bridge builders completed 35 bridge structures (over 2,000 linear meters). Among the most significant was the bridge across the Usva River (250 linear meters) at the 93rd kilometer of the Polazna-Chusovoy highway. This is a vital transportation artery, providing access to the city of Chusovoy and from there to the northern part of the Kama region, including Gubakha, Solikamsk, Gremyachinsk, Lysva, Kungur, and Gornozavodsk. The bridge connects the main entrance to Chusovoy from Perm with Yuzhnaya Street, located on the other bank of the Usva. It carries a large volume of traffic daily, including 11 urban, suburban, and inter-municipal routes.

The bridge over the Iren River in Kungur was overhauled six months ahead of the contract deadline. Located on Krasnoarmeyskaya Street, the bridge provides transportation links between the village of Zairensky and the Nagorny District with the central part of Kungur, including the Mashzavod and Cheryomushki neighborhoods, home to numerous socially significant facilities. Furthermore, the reopening reduces traffic congestion on the adjacent Preobrazhensky Bridge. Upon completion, the bridge is a meter higher, while its width and length remain the same.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.