Financial news: On December 4, 2025, the Moscow Small Business Lending Assistance Fund will hold a deposit auction.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

Parameters;

The deposit auction date is 04.12.2025. Placement currency is RUB. The maximum amount of funds placed (in the placement currency) is 145,000,000. Placement term, days – 14. Date of depositing funds is 05.12.2025. Date of return of funds is 19.12.2025. Minimum placement interest rate, % per annum is 16.25. Terms of the conclusion, urgent or special (urgent). The minimum amount of funds placed for one application (in the placement currency) is 145,000,000. The maximum number of applications from one Participant, pcs. 1. Auction form, open or closed (Open).

The basis of the Agreement is the General Agreement. Schedule (Moscow time). Preliminary applications from 15:30 to 15:40. Competitive applications from 15:40 to 15:45. Setting the cutoff interest rate or declaring the auction invalid before 15:55. Additional terms and conditions – Placement of funds with the option of early withdrawal of the entire deposit amount and payment of accrued interest on the deposit amount at the rate established by the deposit transaction, in the event of the Bank's non-compliance with the requirements set forth in paragraph 2.1. of the Regulation "On the procedure for selecting banks for the placement of funds of the Moscow Small Business Lending Promotion Fund in deposits (deposits) under the GDS" (as amended on the date of the deposit transaction), early withdrawal at the "on demand" rate, interest payment at the end of the term, without replenishment.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: Who are the Fixies (December 4, 2025).

Translation. Region: Russian Federation –

Source: Central Bank of Russia

An important disclaimer is at the bottom of this article.

On December 5, 2025, the Bank of Russia will issue commemorative coins "The Fixies" from the "Russian (Soviet) Animation" series:

– silver coin of 3 rubles;

– made of nickel-plated steel with a face value of 25 rubles;

– made of copper-nickel alloy with a color coating with a face value of 25 rubles.

The animated series "The Fixies" premiered in Russia in 2010. It follows the adventures of little people who live inside various devices and mechanisms. The Fixies are highly tech-savvy and easily explain to children how the modern world works.

Description of a coin made of precious metal

A silver coin with a denomination of 3 rubles (pure precious metal weight – 31.1 g, alloy fineness – 925) has a round shape with a diameter of 39.0 mm.

There is a raised edge around the circumference of both the front and back sides of the coin.

The obverse of the coin features a relief image of the State Emblem of the Russian Federation, along with the inscriptions: "RUSSIAN FEDERATION", "BANK OF RUSSIA", the coin denomination "3 RUBLES", the year of issue "2025", the metal designation according to D.I. Mendeleyev's Periodic Table of Elements, the alloy fineness, the trademark of the St. Petersburg Mint, and the pure weight of the precious metal.

On the reverse side of the coin (catalogue number 5111-0532) there is a color image of the characters from the animated series “The Fixies”, with the inscription “FIXIES” at the top.

The side surface of the coin is corrugated.

The coin is made in proof quality.

The mintage of the coin is 7.0 thousand pieces.

Description of coins made of base metals

Coins made of base metals with a denomination of 25 rubles have a circular shape with a diameter of 27.0 mm.

The obverse and reverse sides of the coins have a raised edge around the circumference.

The side surface of the coins is corrugated.

On the obverse of the coins is a relief image of the State Emblem of the Russian Federation, above it along the edge is the semicircular inscription "RUSSIAN FEDERATION", framed on both sides by double diamonds, on the right is the trademark of the Moscow Mint, under the emblem in the center in three lines is the inscription "BANK OF RUSSIA", the denomination of the coins "25 RUBLES", the year of issue "2025".

On the reverse side:

– nickel-plated steel coins (catalog No. 5715-0004) feature a relief image of the characters from the animated series “The Fixies” with the inscription “FIXIES” at the top;

– coins made of copper-nickel alloy (catalog No. 5015-0078) feature a color image of the characters from the animated series "The Fixies" with the inscription "FIXIES" at the top.

Coin circulation:

– made of nickel-plated steel – 850.0 thousand pieces;

– made of copper-nickel alloy with colored coating – 150.0 thousand pieces.

The issued coins are legal tender in the Russian Federation and are accepted at face value for all types of payments without restrictions.

When using the material, a link to the Press Service of the Bank of Russia is required.

December 4, 2025

13:41:00

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Marat Khusnullin: Around 900,000 Russians have moved out of dilapidated housing since 2019.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Reducing the housing stock unfit for habitation is a priority for Russia's construction industry. Since 2019, nearly 900,000 people have been relocated from more than 15 million square meters of dilapidated housing, according to Deputy Prime Minister Marat Khusnullin.

“The resettlement of people from dilapidated buildings is being carried out on the orders of President Vladimir Putin. Since 2019, this socially significant program, coordinated by the Russian Ministry of Construction, has been implemented as part of the "Housing and Urban Environment" national project, and is now being continued under the "Infrastructure for Life" national project. Since 2019, nearly 900,000 people have been relocated from over 15 million square meters of dilapidated housing. Since the beginning of 2025, 70,000 residents have moved from dilapidated buildings with a total area of 1.2 million square meters to new apartments. Support has already been allocated for regions, including Donbas and Novorossiya, for 2025–2027. Under the new national project, the Territorial Development Fund, the program's operator, has already approved funding totaling approximately 38.2 billion rubles for the regions. This will allow for the relocation of approximately 1 million square meters of dilapidated housing, inhabited by approximately 56,800 people," said Marat Khusnullin.

According to the Deputy Prime Minister, the leaders in terms of the number of people relocated from dilapidated housing include the Khanty-Mansi Autonomous Okrug, where 62,000 people have improved their housing conditions since the beginning of 2019; the Yamalo-Nenets Autonomous Okrug (59,000); Perm Krai (56,000); the Sakha Republic (Yakutia) (50,000); and Kemerovo Oblast (34,000).

"An additional tool for relocating residents from dilapidated and decrepit housing is integrated territorial development. The Fund, as the operator of the program for relocating residents from dilapidated housing, partially reimburses developers for these costs in KRT projects. Currently, approximately 160 such projects are being implemented in 33 regions of the country, which are relocating residents from dilapidated and decrepit housing. This will make it possible to remove nearly 300,000 square meters of unsuitable housing in the coming years and improve living conditions for 16,700 people," said Vasily Kupyzin, CEO of the Territorial Development Fund.

From 2025 to 2030, 345,000 people are scheduled to be relocated from dilapidated buildings with a total area of 6.2 million square meters as part of the national project "Infrastructure for Life."

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: On trading one-day futures with automatic rollover in December 2025.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

Moscow Exchange reminds that the specifications of one-day futures contracts with automatic rollover on currency pairs, indices, stocks, and gold (USDRUBF, EURRUBF, CNYRUBF, GLDRUBF, IMOEXF, SBERF, and GAZPF) provide for the possibility of submitting execution orders for quarterly contracts on the corresponding underlying assets.

The earliest execution order submission date is December 4, 2025. Orders are submitted 10 trading days prior to the expiration of the nearest quarterly futures contracts. Orders are executed during the evening clearing of the day the order is submitted. Detailed information on the order submission and execution dates, as well as the execution mechanism, is provided on the pageshttps://www.moex.com/a8141,https://www.moex.com/a8493,https://www.moex.com/a8803Andhttps://www.moex.com/a8805.

When executing perpetual futures, a one-time fee of 3% of the contract's par value applies. This fee is paid by the party submitting the execution order to the party whose positions were executed without submitting the order. The fee calculation formula is specified in the contract specifications.

The clearing center also charges a commission of 0.1% of the par value for executing orders for overnight contracts with automatic rollover. Participants' contracts may be executed without submitting an order if there are not enough counter-orders for execution, as stipulated by the clearing rules of the NCC (JSC). In this case, no execution commission is charged.

The execution of orders is carried out in accordance with the procedure stipulated by the clearing rules of the NCO NCC (JSC) and the contract specifications:

Execution is carried out by two transactions: closing a position in a one-day contract and opening a position in the nearest quarterly futures (these transactions occur at the Contract's settlement price during evening clearing); Counter orders are executed first; The remaining orders that are not executed as a result of the execution of counter orders are executed without submitting an order;

The selection of settlement codes, the positions of which are executed without submitting orders, occurs proportionally to the volume of open positions in descending order of the volume of open positions (opposite direction).

Contact information for media: 7 (495) 363-3232PR@moex.com

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Dmitry Patrushev congratulated the staff of Timiryazev Academy on the university's anniversary.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Deputy Prime Minister Dmitry Patrushev took part in a ceremony marking the 160th anniversary of the Russian State Agrarian University – Timiryazev Moscow Agricultural Academy.

Dmitry Patrushev read out a congratulatory message from Russian President Vladimir Putin.

"The rich history of your university, its remarkable traditions passed down from generation to generation, is a source of particular pride for the university staff. Over the years, its walls have produced a galaxy of talented scientists, educators, and qualified specialists who have made significant, creative contributions to the development of domestic science, the agro-industrial complex, and strengthening the country's food security," the congratulatory message reads.

Dmitry Patrushev echoed the head of state's remarks. The Deputy Prime Minister noted that since its establishment, the Timiryazev Agricultural Academy has consistently served the interests of the agro-industrial complex at every stage of the country's development. The university has always been an active participant in reforms aimed at strengthening the position of agriculture.

"You have trained over 200,000 specialists who have made a significant contribution to the development of the agro-industrial complex. The achievements of many of them are etched in gold into the history of the industry, not only in Russia but also in our partner countries. Today, the university is successfully nurturing a new generation of agricultural professionals, effectively responding to the needs of the agro-industrial complex, and introducing new, relevant training areas. The university supports the development of science and participates in the creation of promising research projects. You have your own world-class research center and other hubs for realizing the potential of young, passionate professionals. I sincerely congratulate you on your anniversary! 160 years is just the beginning," said Dmitry Patrushev.

By decree of Russian President Vladimir Putin, the staff of Timiryazev Academy was awarded the Order "For Valiant Labor" for many years of dedicated work. Dmitry Patrushev presented the award to the university's rector, Vladimir Trukhachev.

The gala event at the State Kremlin Palace brought together faculty, students, and graduates. The university's history, achievements, and future were presented on stage. Today, Timiryazev Academy is a flagship of agricultural education in Russia, carefully preserving traditions, advancing science, and confidently moving forward.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Yuri Trutnev: The Amur Region is developing at an accelerated pace.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

In Blagoveshchensk, Deputy Prime Minister and Presidential Plenipotentiary Envoy to the Far Eastern Federal District Yuri Trutnev held meetings on the state of the economy and plans for the socio-economic development of the Amur Region, the progress of new investment projects in the region, and visited master plan sites for the regional capital. He also reviewed the construction of border infrastructure and the modernization of airport infrastructure.

"Overall, the Amur Region is demonstrating good growth rates, growing at an accelerated pace. According to the results of the third quarter of 2025, industrial production growth in the Amur Region amounted to 5.9%, and fixed capital investment in the first half of 2025 increased by 7.4%," Yuri Trutnev opened the meeting.

According to Amur Region Governor Vasily Orlov, the Amur Region's economic growth rate exceeds the Russian average. "Since 2020, the GRP has doubled to 1 trillion rubles. By 2030, 1.7 trillion rubles are expected to be generated through the commissioning of major investment projects. Over the past five years, private investment in the region's economy has totaled 3 trillion rubles," Orlov noted.

The region has a priority development area (PDA) and financial and infrastructure support programs. Fifty-four investors with projects worth 2.473 billion rubles have already taken advantage of these programs. 2.032 billion rubles have been invested, and 19 projects have been commissioned. Fifteen thousand jobs have been created.

Public-private partnerships are being used to support investment projects in various sectors. PPPs are being used to build a new airport terminal, create infrastructure for the international bridge across the Amur River, upgrade street lighting, begin reconstruction of the Blagoveshchensk City Park of Culture and Recreation, and update public utilities infrastructure.

The region has compiled a list of new promising projects in six economic sectors: agriculture, mining, energy, gas chemistry and polymer processing, transport and logistics, and tourism.

Work in the social sphere continues. At the direction of Russian President Vladimir Putin, master plans for four cities in the Amur Region have been approved: Blagoveshchensk, Svobodny, Belogorsk, and Tynda. At the direction of Russian Prime Minister Mikhail Mishustin, master plan activities were updated this year, and a long-term development plan was approved for the closed administrative-territorial entity (ZATO) Tsiolkovsky, which will be developed in an agglomeration with Svobodny. The plans provide for the implementation of 239 measures, of which 43 have been completed to date. These measures include the construction of a civil registry office in Svobodny, a gas boiler house and associated heating networks in Belogorsk, and the improvement of two public areas and 45 courtyards in Blagoveshchensk. A series of landscaping, major repairs, and reconstruction of utility, transport, and social infrastructure facilities was completed in Tynda, timed to coincide with the celebration of the 50th anniversary of the capital of the Baikal-Amur Mainline (BAM).

Thanks to national projects, people's quality of life is constantly improving. Last year, 13 national projects were completed, and this year, the Amur Region is participating in 12 new national projects. Overall, over 93 billion rubles have been allocated from the federal budget over the past seven years. The largest portion of funds this year is being allocated to the "Infrastructure for Life," "Family," and "Youth and Children" national projects.

The Hectare and Far Eastern Mortgage programs remain in effect. Over 15,900 loan agreements have been signed under the preferential mortgage program. Over 16,300 people have received land plots under the Hectare program in the Amur Region.

The meeting paid special attention to the construction sector. The Amur Region has been increasing housing construction volumes annually since 2018, with record-breaking new construction over the past three years. In 2024, 506,000 square meters of residential space were commissioned in the Amur Region. Compared to the same period in 2023, this figure was 102%, ranking sixth among regions in the Far Eastern Federal District. Urban development potential has been created, amounting to over 2.6 million square meters.

Regional authorities, together with the Ministry for the Development of the Russian Far East,DOM.RF" supported the construction of 2,470 apartments of subsidized rental housing. The first apartments under the program will be occupied by residents as early as 2026. The apartments will be provided to participants of the Secondary Military Education Program, targeted students, doctors, and teachers.

Before the meeting, Yuri Trutnev inspected Tribune Hall, a key feature of Blagoveshchensk's master plan on the Golden Mile section of the Amur River embankment. The total cost of the architectural complex, which includes Tribune Hall, the Fountain Alley, pavilions housing the Amur Dino Park and a children's center, as well as the improvement of the adjacent 7.7-hectare area, was 3.2 billion rubles, of which 1.5 billion rubles came from the Far Eastern presidential unified subsidy.

At a meeting on the progress of new investment projects in the Amur Region, investors' plans to create two logistics complexes, an industrial park, a wind farm, and residential areas were discussed. These projects will attract an additional 150 billion rubles to the Far East.

"The Amur Region is the leader in terms of attracted investment in the Far East. Over the past 10 years, investment projects implemented in the Amur Region with state support have attracted over 2 trillion rubles. In total, more than 70 investment projects with state support are being implemented in the region, with a total investment volume of 2.5 trillion rubles. 22 of these projects have been commissioned, creating nearly 15,000 jobs," said Yuri Trutnev.

VetroSPK presented a project to build wind farms with a capacity of up to 400 MW in the Zavitinsky Municipal District. FSK Region, a subsidiary of FSK Group, also discussed housing and recreation projects. Several investor proposals for the creation of logistics facilities in Blagoveshchensk were considered. Transporter LLC is preparing documents to obtain priority development area (PDA) resident status in order to implement the Trans Vostok logistics hub project. AiGroup, as a resident of the Amurskaya PDA, plans to build a 39,700 square meter logistics complex in the region. An industrial park for the production of high-tech equipment, including materials for 3D printers and components for hydrogen energy, may be established in the Blagoveshchensk Municipal District. This park is expected to create approximately 1,000 jobs.

That same day, the Deputy Prime Minister inspected the progress of construction of the permanent international automobile checkpoint and customs and logistics terminal "Kani-Kurgan." Both facilities are located near the Blagoveshchensk-Heihe International Bridge. The border crossing reconstruction is being carried out as part of the "Efficient Transport System" national project. The permanent automobile checkpoint project envisions the construction of 48 buildings and structures with a total area of over 8,000 square meters. According to the design documentation, the total throughput capacity of the Kani-Kurgan international automobile checkpoint will be 862 vehicles and approximately 5,500 people per day. The border crossing will have 16 traffic lanes, with the potential to increase to 24. Currently, freight traffic is handled on six lanes.

Yuri Trutnev also reviewed the progress of reconstruction, modernization, and operation of infrastructure facilities at Blagoveshchensk International Airport (Ignatievo) named after N.N. Muravyov-Amursky.

A large-scale reconstruction of the airport's terminal complex is currently being completed. Construction began in 2023. The building covers over 25,000 square meters, with a design capacity of 600 passengers per hour on domestic routes and 400 passengers per hour on international routes. Finishing work is currently underway inside the building. Reconstruction of the terminal area, which now includes a 600-space parking lot, has been completed. Improvements to the airport's terminal area are also underway.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Tatyana Golikova, Dmitry Chernyshenko, and Alexey Overchuk presented awards to the winners of the International Prize

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Deputy Prime Ministers of Russia Tatyana Golikova, Dmitry Chernyshenko, and Alexey Overchuk attended the award ceremony for the winners of the International Prize

The event brought together more than 18,000 social project leaders, heads of charitable foundations, volunteers and mentors, volunteer movement organizers, and volunteer network participants from 48 countries.

Russian President Vladimir Putin awarded the winner of the "Volunteer of the Year" award. The winner was Anna Pluzhnikova, a participant in the Anapa environmental disaster relief mission.

He also congratulated volunteers on the upcoming holiday – Volunteer Day.

"Thank you very much for being here, in your position, helping the country and, most importantly, helping specific people solve the problems they face," the President said during the ceremony.

Deputy Prime Minister Tatyana Golikova and People's Artist of Russia Konstantin Khabensky presented awards to the winners in the "Code of Mercy" category. The first-place winner was the "Tylsym" Inclusive Center project from the Republic of Tatarstan.

"Our prize is turning five years old. We couldn't have imagined that in such a short period of time, the number of people for whom it would become an integral part of their lives would be so great. Over these five years, more than 200,000 applications have been submitted. And every year, the number grows. 2025 is no exception: over 52,000 applications have been submitted from 147 countries. This is already a global prize, and I sincerely congratulate you on this.

And, of course, this was made possible because there are so many caring people in the world. "The Code of Mercy" is an extraordinary nomination. It's something in our blood, something we live for. I don't know a single person who doesn't share a part of themselves with another. Our nominees make our country what it is today. These people have done everything possible to ensure that the elderly, people with disabilities, SVO participants, and those who dedicate themselves to promoting a healthy lifestyle and donating blood received assistance. Thanks to people like you, the country is growing stronger, its good deeds are multiplying, and, most importantly, it brings even more caring people into this orbit," emphasized the Deputy Prime Minister of Russia, co-chair of the organizing committee for the International Prize.

The Tylsym (Magic) Children's Inclusive Center helps children with various disabilities learn, develop, and communicate. The center has two main programs: group developmental and rehabilitation classes, and a training apartment for children with mental disabilities.

Tatyana Golikova, Konstantin Khabensky, and Zhang Ling, Deputy Secretary-General of the Conference on Interaction and Confidence-Building Measures in Asia, also presented awards to the winners in the international category "Helping People." Projects from Kenya, Kazakhstan, and Serbia shared the award.

Dmitry Chernyshenko presented the awards in the Mentor of the Year category.

"It's no coincidence that our President, Vladimir Vladimirovich Putin, says that Russia is a country of volunteerism. More than 9 million participants are registered on the Dobro.RF platform. This award is very important. Since this year, it has become part of the national project 'Youth and Children.' This national project has a large number of different tools that you should know how to use. But most importantly, it has measurable indicators. By 2030, the President has mandated that more than 45% of our youth regularly participate in volunteer and community activities. I hope you are willing to help them and share your experiences," he noted.

The Deputy Prime Minister emphasized the important role of parents and mentors and called volunteering a calling.

"Nearly 5,000 applications is a good result. And as trite as it may sound, each one is a winner. But the public vote and experts, of course, identified the most important one, the one we will honor today, the one we will identify as a role model for this year," he added.

First place in the category went to Anatoly Zamyatin, an employee of the Russian Ministry of Emergency Situations from the Altai Territory who heads the council of mentors for the fire and rescue unit. He organized over 200 events to help new employees adapt. Under his leadership, 20 groups of cadets completed practical training, many of whom became specialists and mentors.

Dmitry Chernyshenko, along with Artem Metelev, Chairman of the State Duma Committee on Youth Policy and Chairman of the Board of the Dobro.RF Association, also reviewed an exhibition of volunteer achievements and spoke with volunteers.

In particular, at the stand of humanitarian missions

At the "Everything for Victory!" stand, the Deputy Prime Minister was presented with the results of the People's Front movement's efforts to assist frontline soldiers and civilians in border areas. Dmitry Chernyshenko left commemorative inscriptions on the movement's chevron and flag.

During the awards ceremony, Deputy Prime Minister Alexey Overchuk and UN Volunteers Executive Coordinator Toyli Kurbanov presented the award to the winner in the special category "Good Deed of the Year." The winner was Anton Marie Lim from the Philippines for his project "Yellow School Boat."

"In the international direction of the award

The Yellow Boat of Hope is the flagship initiative of the Yellow Boat of Hope Foundation Philippines, established in 2010. Over the past 15 years, the project has provided over 5,500 boats to approximately 40,000 students in remote areas to help them get to school.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: 03.12.2025, 17-56 (Moscow time) the values of the upper limit of the price corridor and the range of market risk assessment for the security RU000A1098W8 (DOM 1P-18R) were changed.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

December 3, 2025

17:56

In accordance with the Methodology for determining the risk parameters of the stock market and deposit market of PJSC Moscow Exchange by the NCC (JSC) on 03.12.2025, 17-56 (Moscow time), the values of the upper limit of the price corridor (up to 106.11) and the range of market risk assessment (up to 1365.15 rubles, equivalent to a rate of 10.0%) of the security RU000A1098W8 (DOM 1P-18R) were changed.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Marat Khusnullin: Monolithic work has been completed in the educational and laboratory building of the Orel campus.

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – Government of the Russian Federation –

An important disclaimer is at the bottom of this article.

Monolithic work has been completed on the educational and laboratory building being constructed on the inter-university campus of I.S. Turgenev Oryol State University. Deputy Prime Minister Marat Khusnullin announced this.

"Creating a network of world-class university campuses is a significant contribution to both improving the quality of education and science, as well as to the integrated development of cities. This work is being carried out at the direction of the President. A student campus with modern infrastructure is being built at the I.S. Turgenev OSU. Concrete work has been completed on one of the facilities—the educational and laboratory building. Approximately 2,000 students will be able to study in the five-story building, which covers over 27,000 square meters. It will house educational and laboratory spaces, student study areas, a prototyping and reengineering center, and an auditorium with a foyer," said Marat Khusnullin.

Work is currently underway on the roof, exterior walls, and interior partitions in the academic and laboratory building, along with interior finishing. In the future, the building will house a modular library, a copy center, a cafeteria, utility rooms, technical facilities, and other spaces.

"The campus is being built as part of the register of capital construction projects, part of the comprehensive state program 'Construction,' overseen by the Russian Ministry of Construction. To promote youth sports, a new football field with artificial turf and 500-seat stands will be built on the campus. Concrete work is currently being completed on the site, covering over 1,500 square meters," said Deputy Minister of Construction, Housing and Utilities Yuri Gordeyev.

Construction of the inter-university campus, covering approximately 60,000 square meters, began in the summer of 2024. This modern campus will bring together students and faculty from six of the city's universities.

"A dormitory complex consisting of three buildings is currently under construction on the campus. Work is underway on the stained-glass windows, facades, and roofing. Interior finishing is also underway. In addition to residential rooms, the buildings will also feature modern gyms, independent study areas, and leisure facilities," noted Karen Oganesyan, CEO of the Unified Customer Production and Consulting Company.

The construction of the campus in Orel is being carried out on the instructions of Russian President Vladimir Putin and the Russian Government.

Five more campuses are being built by specialists from the Unified Customer Development Company in Novosibirsk, Yekaterinburg, Kaliningrad, Smolensk, and Moscow.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.

Financial news: On December 4, 2025, JSC KAVKAZ.RF will hold a deposit auction.

Translation. Region: Russian Federation –

Source: Moscow Exchange – Moscow Exchange –

An important disclaimer is at the bottom of this article.

Parameters;

The deposit auction date is December 4, 2025. The placement currency is RUB. The maximum amount of funds placed (in the placement currency) is 1,500,000,000.

Placement period, days 179. Date of deposit of funds 05.12.2025. Date of return of funds 02.06.2026.

The minimum placement interest rate, % per annum, is 15.8. Terms of the conclusion are fixed-term or special (Fixed-Term). The minimum amount of funds placed per application (in the placement currency) is 1,500,000,000. The maximum number of applications from one Participant is 1. Auction format is open or closed (Open).

The basis of the Agreement is the General Agreement. Schedule (Moscow time). Preliminary bids from 10:00 to 10:10. Competitive bids from 10:10 to 10:15. The cutoff percentage may be set or the auction may be declared void by 10:25. Additional terms and conditions.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.