Sergei Sobyanin spoke about the development of the street and road network in the Metrogorodok district.

Translation. Region: Russian Federation –

Source: Moscow Government – Moscow Government –

An important disclaimer is at the bottom of this article.

Road reconstruction will be carried out in Kaloshino, one of Moscow's largest former industrial zones. This was reported on the channel in MAX messenger Sergei Sobyanin reported.

“We will renew the section of Otkrytoye Shosse and Tagilskaya Street to Nikolaya Khimushina Street and further to Projected Driveway No. 2277. A new one will appear in the area of Permskaya Street

connection with the Moscow High-Speed Diameter“- the Mayor of Moscow noted.

Source: Sergei Sobyanin's channel in MAX messenger 

Modern bus stops will be installed, utility systems will be upgraded, and the area will be landscaped. Ground transportation routes will be adjusted to connect new residential complexes with the rail-based stations.

As a result, Metrogorodok's transport accessibility will significantly improve. This is especially important for the rapidly developing areas of Kaloshin, currently home to approximately 40,000 people.

The work is planned to be completed in 2028.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.