A permit has been issued for the construction of a house under the renovation program in Beregovoy Proezd

Translation. Region: Russian Federal

Source: Moscow Government – Government of Moscow –

An important disclaimer is at the bottom of this article.

An apartment building will be built in the Filevsky Park area under the renovation program. The corresponding permit was issued by the capital's State Construction Supervision CommitteeThe head of the department reported this. Anton Slobodchikov.

The work will be carried out at the address: Beregovoy proezd, land plot No. 9/1.

"A new building with a residential area of over 9.3 thousand square meters will be erected on the site of a dilapidated five-story building. It will consist of one section with underground parking. The building will have apartments of various layouts with full finishing in accordance with the Moscow Government Resolution," Anton Slobodchikov noted.

The first floor will house public spaces and a resettlement information center.

In the Filevsky Park area, a plot of land has been cleared for the construction of a house under the renovation program

The entrance group will be made through. On the first floor, there will also be a hall with mailboxes, a pram room and a concierge room. In addition, the building will have two elevators with a lifting capacity of one thousand kilograms and two with a lifting capacity of 400 kilograms.

For external finishing, a curtain wall system is used. Baskets for external air conditioner units will be installed on the outside of the walls.

"Each house under the renovation program is built according to an individual architectural project. In this case, brick and milky-colored porcelain stoneware is used to finish the main part of the facades, as well as black elements, including air conditioner baskets made of glass fiber concrete rusticated panels and metal cassettes," said the chief architect of Moscow, first deputy chairman of the capital's Committee for Architecture and Urban Development (Moskomarkhitektura)

Sergey Kuznetsov.

On the territory of about 2.7 thousand square meters, driveways and sidewalks will be equipped, as well as an open flat parking lot for 21 cars. In addition, there will be recreation areas with benches, children's and sports grounds, trees and bushes will be planted, lawns and flower beds will be laid out.

On the instructions of Sergei Sobyanin, the city is paying close attention to the quality of work on residential properties under the renovation program.

As Anton Slobodchikov noted, the construction of the building will be carried out on a land plot of more than 0.3 hectares. After the developer submits a notice of commencement of work, inspectors will draw up a program of inspections. Control and supervision activities will be carried out throughout all stages of the building's construction. Specialists from the subordinate Center for Expertise, Research and Testing in Construction will be involved in them. They will conduct laboratory and instrumental studies to assess the compliance of the structures being erected and the materials used with the requirements of the design documentation.

The renovation program was approved in August 2017. It concerns about a million Muscovites and provides for the resettlement of 5,176 houses. Sergei Sobyanin ordered to increase the pace implementation of the program twice as much.

Moscow is one of the leaders among regions in terms of construction volumes. High rates of housing construction correspond to the goals and initiatives of the national project "Infrastructure for life". You can learn more about Russia's national projects and the capital's contribution atspecial page.

Quickly find out the main news in the official channels of the city of Moscow in messengers Max And "Telegram".

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

.