Translation. Region: Russian Federation –
Source: Government of the Russian Federation – Government of the Russian Federation –
An important disclaimer is at the bottom of this article.
Construction and installation work is nearing completion at the Institute of Medicine and Psychology's educational and research center, which is being built on the grounds of Novosibirsk State University. Deputy Prime Minister Marat Khusnullin announced this.
"Following the President's instructions, we are systematically creating a network of modern, world-class campuses across the country. This is a driver of educational and urban development. One example is Novosibirsk State University, where the company "Unified Customer" is currently implementing the second phase of construction on a new campus. The modern buildings being built on the university's campus not only meet high architectural and design standards but also create comfortable conditions for students and faculty. Construction work is currently nearing completion on the building housing the Institute of Medicine and Psychology's Educational and Research Center. The building is 85% complete," said Marat Khusnullin.
The new building will accommodate approximately 700 students. It will house laboratories and training facilities for specialists in chemistry, biology, medicine, psychology, physiology, and other subjects. The building will also house the largest simulation center in Siberia for future medical professionals to practice their skills in minimally invasive surgery and clinical training.
"Interior finishing is currently underway at the 12,500-square-meter facility, with work already 60% complete. Installation of internal utility systems is nearing completion. Roofing and façade work has already been completed. Landscaping of the surrounding area is also 76% complete. Construction of the building is scheduled for completion in the second quarter of 2026," noted Karen Oganesyan, General Director of Unified Customer.
The second phase of campus construction includes the construction of three buildings with a total area of over 40,000 square meters. One of these buildings, a classroom building with an area of approximately 16,000 square meters, is already operational. Students began classes in the new building on September 1, 2025. It features four classrooms, one of which seats 400 students, a research library, a student project center, coworking spaces, and a conference hall. A research center is also being built as part of the second phase. All buildings will be able to accommodate up to 3,000 students.
Five more campuses are currently being built by specialists from the Unified Customer Development Company in Orel, Yekaterinburg, Kaliningrad, Smolensk, and Moscow.
Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.
