Glazing work on a 350-seat kindergarten in the Filimonkovsky district has been completed.

Translation. Region: Russian Federation –

Source: Moscow Government – Moscow Government –

An important disclaimer is at the bottom of this article.

Glazing of a 350-child kindergarten in the Novomoskovsky Administrative District has been completed. Construction workers are also working to seal the building's thermal envelope, after which they will begin cladding the façade. This was announced by the Moscow Government Minister and Head of the Moscow Department of Urban Development Policy. Vladislav Ovchinsky.

"The building, designed to house 14 group rooms, was glazed with 105 translucent structures, including stained glass. The floors in the group rooms will be covered with safety linoleum. The walls will be finished with porcelain stoneware with a wood-like texture. Once construction is complete, the preschool will be transferred to the city education system," said Vladislav Ovchinsky.

Work is underway in the Filimonkovsky district as part of the construction of the "First Moscow" city-park. The kindergarten is being built at Lapteva Street, plot no. 2. It will be the seventh in the neighborhood.

The first floor is designed to house four group units with private bedrooms and refreshment areas. It will also house medical and treatment rooms, a full-service kitchen, and utility rooms. The second floor will house five group units, a music room, and a room for developmental activities. The third floor will house five more group units, a multi-purpose gym, and a room for special education activities.

Committee for State Construction Supervision of the City of Moscow (Mosgosstroynadzor) supervises the construction of the kindergarten at all stages.

"The committee's inspectors have already conducted the first on-site inspection, during which they assessed the compliance of the monolithic works and the geometric parameters of the supporting structures with the approved design solutions," added the chairman of the Moscow State Construction Supervision Authority.

Anton Slobodchikov.

The improvement project includes the creation of 14 playgrounds, a traffic safety training area, and two sports zones. Installation of all playground and sports facilities is complete. The final phase will include landscaping, including the installation of turf and the planting of shrubs and trees.

The kindergarten is separated from residential buildings by bicycle and pedestrian paths, without crossing the roadway.

The construction of social facilities in Moscow is in line with the goals and initiatives of the national project Infrastructure for LifeMore information about Russia's national projects and the capital's contribution can be found atspecial page.

Get the latest news quickly on official Moscow messaging channels. MAX AndTelegram.

Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.