Translation. Region: Russian Federation –
Source: Moscow Government – Moscow Government –
An important disclaimer is at the bottom of this article.
Over 4.2 kilometers of utility lines were modernized by specialists from the Moscow City Services Complex in the Presnensky District of the capital. The work covered water supply and wastewater disposal systems. Nearly three kilometers were built, and over 1.2 kilometers were reconstructed. The diameter of the installed pipes ranged from 100 to 400 millimeters.
Specialists updated networks in the historic development area and also installed utilities for new urban projects—for example, a multifunctional complex with underground parking located on Elektrichesky Lane.
The work involved using modern materials made from high-strength, domestically produced polyethylene. These pipes can withstand external pressure and the stresses of pressurized water transport. The smooth inner surface reduces hydraulic resistance and slows the formation of scale and salt deposits. Furthermore, these materials are corrosion-resistant.
To upgrade and install city utilities, Mosvodokanal specialists primarily used trenchless technologies, which minimizes environmental impact and reduces project implementation time.
IN Moscow's urban infrastructure complex They noted that the projects being implemented in the capital to improve and create a comfortable urban environment are in line with the goals and objectives of the national project Infrastructure for LifeMore information about Russia's national projects and the capital's contribution can be found atspecial page.
Get the latest news quickly on official Moscow messaging channels. MAX And Telegram.
Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.
