Translation. Region: Russian Federation –
Source: Moscow Government – Moscow Government –
An important disclaimer is at the bottom of this article.
As part of the program My School The capital is renovating educational institutions, making them more modern and functional. Sergei Sobyanin announced this on his channel inmessenger MAX.
"Not only the facades and interiors are being changed, but also the technical infrastructure. Specifically, all utility systems are being completely updated. Children should study in bright and comfortable spaces. Specialists have already done a tremendous amount of work installing and upgrading various utilities," the Moscow Mayor wrote.
Source: Sergei Sobyanin's Messenger channel MAX
During the building renovations, 13.5 kilometers of water supply lines and over five kilometers of wastewater lines were repaired and replaced. In addition, water metering units were replaced at most of the facilities.
In addition, transformer substations are being built and over 186 kilometers of cable lines are being laid. This will provide schools with additional capacity and the ability to use backup power during power outages.
In addition, over 55 kilometers of heating networks will be repaired and upgraded, and heating station equipment will be modernized to ensure uninterrupted heat and hot water supply. Stormwater drainage systems will also be upgraded where necessary.
All work is carried out using modern specialized equipment and necessary technologies. Domestically produced materials are used.
Implementation programs "My School" started last year. After reconstruction 55 buildings have already opened.2026 It is planned to renovate dozens of schools annually.
Subscribe to Sergei Sobyanin's official channels on messengers MAX And Telegram.
Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.
