Translation. Region: Russian Federation –
Source: Moscow Government – Moscow Government –
An important disclaimer is at the bottom of this article.
Specialists Moscow City Services Complex Expansion joints on the Luzhnetsky Metro Bridge are being replaced. The work is scheduled to be completed by the end of the year.
A 30-meter-long expansion joint will be replaced on the structure: worn-out structures will be dismantled, installation and reinforcement will be performed, and transition zones will be created. This will improve the reliability and durability of the structure.
Periodic replacement of the joints is necessary due to heavy traffic. This results in a small threshold on the road surface that drivers can feel. Timely replacement of the joints protects the bridge structure from water penetration and deterioration.
During the repairs, the Luzhnetsky metro bridge will not be closed, and vehicle traffic will only be partially restricted.
Previously Deputy Mayor of Moscow for Housing and Public Utilities and Improvement Petr Biryukov reported that special attention is being paid to the maintenance of engineering facilities in the capital, expansion joints They are updated annually. This improves driver comfort and road safety.
In total, similar repairs were planned for six sites in 2025. Work has already been completed on five of them, including the Varshavskaya-MKAD overpass and the Ryabinovaya Street overpass.
Get the latest news quickly on official Moscow messaging channels. MAX And Telegram.
Please note: This information is raw content obtained directly from the source. It represents an accurate account of the source's assertions and does not necessarily reflect the position of MIL-OSI or its clients.
