Translation. Region: Russian Federal
Source: Government of the Russian Federation – Government of the Russian Federation –
An important disclaimer is at the bottom of this article.
Construction work is nearing completion in the new dormitory building of the Saint Petersburg State Marine Technical University. This was announced by Deputy Prime Minister Marat Khusnullin.
"The construction complex of Russia is actively working on creating modern conditions for education and scientific work at universities. High-quality laboratories and classrooms, as well as comfortable housing for students help attract talent to the university and contribute to the development of science. The St. Petersburg State Marine Technical University is the only university in Russia that trains specialists in the entire spectrum of shipbuilding specialties. A new modern dormitory with an area of more than 10 thousand square meters is currently being built for it, the construction readiness of which is already 95%," said Marat Khusnullin.
About 400 students and teachers of the university will live in a comfortable apartment-type dormitory. The building will have blocks for living with a kitchen and a bathroom. There will also be utility and administrative premises there.
"Creating modern, comfortable living conditions for students and teachers is a key task in the development of the country's educational infrastructure. The new dormitory, being built as part of the register of capital construction projects included in the comprehensive state program "Construction", supervised by the Ministry of Construction of Russia, will be a significant contribution to solving this problem for one of our key specialized universities," said Deputy Minister of Construction and Housing and Public Utilities Yuri Gordeev.
Currently, the site has completed roofing and facade installation, finishing work, installation of internal engineering systems and external engineering networks. Furniture assembly and installation are nearing completion, as well as landscaping of the adjacent territory. Commissioning of engineering systems is underway.
"In January 2025, we completed the construction of the research and production building. The facility is now actively functioning. Scientific research and laboratory work, educational and industrial practices are carried out there. The construction of a new building on the basis of the university made it possible to create new modern functional areas, thanks to which students will be able to gain practical skills and in-depth knowledge in the field of marine technology," said Karen Oganesyan, General Director of the Unified Customer PPC.
Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.
.
