70 percent of asphalt renewal work on the Third Transport Ring has been completed

Translation. Region: Russian Federal

Source: Moscow Government – Government of Moscow –

An important disclaimer is at the bottom of this article.

Specialists from the city services complex have completed 70 percent of the work to replace asphalt on the Third Transport Ring (TTK). This was reported by the Deputy Mayor of Moscow for Housing and Public Utilities and Improvement Petr Biryukov.

"Special attention is paid to maintaining the capital's roads in a standard condition. Every year, as part of preparation for the autumn-winter period, we carry out activities to renew the asphalt concrete pavement. This year, large-scale work is planned on the Third Transport Ring – the second longest key ring road, there we will repair 16 sections with a total area of about 700 thousand square meters," said Pyotr Biryukov.

Work has already been completed at nine sites, including the interchange with Ostapovsky Proezd, Avtozavodskaya Street within the Third Transport Ring, the section from Andreevsky Bridge to Komsomolsky Prospekt, as well as some places on the outer and inner rings from Volgogradsky Prospekt to Avtozavodskaya Street in both directions.

Currently, repairs are ongoing on the section from Komsomolsky Prospekt to Berezhkovsky Bridge and in the Gagarin Tunnel. More than 200 specialists and over 100 units of specialized equipment are involved in the work on the TTK.

One of the reasons for road repairs is rutting, which is caused by heavy traffic. It causes discomfort to drivers and can have a negative impact on safety. Therefore, the condition of the highway surface is regularly checked, the warranty period is monitored, and the asphalt is changed in a timely manner. Work is carried out mainly at night, when traffic is less intense.

The repairs are carried out in several stages. First, specialists mill the existing surface, then put the inspection wells and rain grates in order, after which they lay new asphalt. At the final stage, road markings are applied.

During repairs, modern technologies are used and asphalt concrete mixtures are used, which are produced by city-owned plants. During the season, these enterprises produce more than two million tons of mixture.

Get the latest news quicklyofficial telegram channel the city of Moscow.

Please note: This information is raw content obtained directly from the source of the information. It is an accurate report of what the source claims and does not necessarily reflect the position of MIL-OSI or its clients.

.